Presentation
29 August 2022 Overview and status of Vera C Rubin Observatory system integration, test and commissioning
Author Affiliations +
Abstract
The Rubin Observatory has entered its latter stages of the construction effort with system integration, test and commissioning. All system elements are coming together including components of the telescope, the science camera and software systems for control and data processing. In this paper we report on the progress, status, plans and schedule for integrating the system elements into a fully functional observatory to carry out the 10-year Legacy Survey of Space and Time.
Conference Presentation
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Charles F. Claver, Sandrine Thomas, Kevin Reil, Keith Bechtol, Holger Drass, Leanne P. Guy, Patrick Ingraham, Robert H. Lupton, Austin Roberts, and Brian Stalder "Overview and status of Vera C Rubin Observatory system integration, test and commissioning", Proc. SPIE 12187, Modeling, Systems Engineering, and Project Management for Astronomy X, 121870G (29 August 2022); https://doi.org/10.1117/12.2630643
Advertisement
Advertisement
KEYWORDS
Observatories

Imaging systems

System integration

Cameras

Control systems

Data acquisition

Data processing

Back to Top