PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.
The Southern African Large Telescope has till recently operated without active closed loop control of its Primary Mirror. The reason for this was that there were no suitable edge sensor system available on the market. Recently a system became available and SALT form Fogale Nanotech. The system consist of a sensor, cables and control electronics. The system was still under development and SALT was responsible for the integration of the sensors before deployment on the Telescope. Several issues still had to be addressed. One of these issues was the integration of the sensors at an appropriate production rate. The sensors was supplied as flexible pc boards with different types making up the transmitters and receivers. These flexible boards were bonded to ClearCeram Z L-Brackets before the appropriate connectors were installed. This paper describes the process used to integrate and test the sensors.
Ockert J. Strydom,Jonathan Love, andHitesh Gajjar
"Results from bonding of the SALT primary mirror edge sensors", Proc. SPIE 9912, Advances in Optical and Mechanical Technologies for Telescopes and Instrumentation II, 991244 (22 July 2016); https://doi.org/10.1117/12.2233101
ACCESS THE FULL ARTICLE
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.
The alert did not successfully save. Please try again later.
Ockert J. Strydom, Jonathan Love, Hitesh Gajjar, "Results from bonding of the SALT primary mirror edge sensors," Proc. SPIE 9912, Advances in Optical and Mechanical Technologies for Telescopes and Instrumentation II, 991244 (22 July 2016); https://doi.org/10.1117/12.2233101