KEYWORDS: Telescopes, Spectrographs, Calibration, Fabry Perot interferometers, Observatories, Control systems, Sensors, Control software, Equipment, Domes
MARVEL is a new facility at the Roque de los Muchachos Observatory (La Palma) which comprises an array of four 0.8m telescopes, each feeding via fibre link into a single high-resolution spectrograph. The facility will provide dedicated target vetting and follow-up capability to support large exoplanet surveys through radial velocity measurements with precision at the metre-per-second level. The observatory site, with four new domes and a standalone stabilised spectrograph building, will soon be complete and ready for hardware installation and commissioning. Here we present an overview of the facility and a status update on several component subsystems: the telescope hardware, control software, and scheduling software; the fibre injection units at each telescope; the optical and mechanical design and tolerances of the spectrograph and vacuum vessel; the calibration system hardware and calibration strategies; and the progress in development of the instrument’s data reduction pipeline.
HARMONI is the first light visible and near-IR integral field spectrograph for the ELT. It covers a large spectral range from 450 nm to 2450 nm with resolving powers from 3500 to 18000 and spatial sampling from 60 mas to 4 mas. It can operate in two Adaptive Optics modes - SCAO (including a High Contrast capability) and LTAO - or with NOAO. The project is preparing for Final Design Reviews. HARMONI is a work-horse instrument that provides efficient, spatially resolved spectroscopy of extended objects or crowded fields of view. The gigantic leap in sensitivity and spatial resolution that HARMONI at the ELT will enable promises to transform the landscape in observational astrophysics in the coming decade. The project has undergone some key changes to the leadership and management structure over the last two years. We present the salient elements of the project restructuring, and modifications to the technical specifications. The instrument design is very mature in the lead up to the final design review. In this paper, we provide an overview of the instrument's capabilities, details of recent technical changes during the red flag period, and an update of sensitivities.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.